careers

Join our team of experts.

Senior Project Scheduler

Charlotte, NC 28202

Posted: 04/08/2024 Category: Project Management Job Number: 109717 Pay Rate: $55.00-$62.00hr W2 (Based on relevant experience) Work Location: On-Site

Job Description

SrPC - Scheduler: *Full time, hybrid, 2-3 days/week in office* ***A Senior Scheduler must have hand on experience developing schedules, updating schedules, and using resource assignments in a project schedule (using primavera (p6) as the scheduling software).
Should have experience providing variance analysis of a project schedule and be able to recommend recovery plans.
Workers at this level lead the development of the reporting systems for project controls assignments.
They perform complex aspects of individual scheduling, change documentation and cost control while reporting up to program or portfolio level as well as trains and teaches other members of PC organization with minimal oversight and wide latitude for unreviewed work.
They are also expected to have advanced skills using primavera (p6) and have the ability to work independently.

Must have experience leading schedule review meetings and work with the project team to obtain information to build / update the project schedule. 

Required Qualifications: Graduation from a four-year college or university - business, finance, project management, engineering, technical, or equivalent. Minimum of 7 years of project controls scheduling experience using primavera (P6). Minimum of 11 years of project controls scheduling experience using primavera (P6) in lieu of a degree.
Expert in project controls principles.
Expertise / Mastery with project management / project controls concepts / computer applications / analytics; employee development; strong collaborative team member; oversight.
Preferred Qualifications: Masters - business, finance, project management, or equivalent. PMI or AACE certification (the following or equivalent are acceptable - PMP, CAPM, PMI-SP, AACE-CCC, AACE-PSP, AACE-CEP, AACE-EVP). Demonstrated proficiency using Software such as MS Office Suite, Primavera, Business Objects, Prolog, Passport, Visio, Powerplant, Maximo, PeopleSoft. Risk management tools This role is for a Senior Project Scheduler who must have demonstrated hands on experience using primavera (p6) as the scheduling software.

Send an email reminder to:

Share This Job:

Related Jobs:

Login to save this search and get notified of similar positions.